By McKenzieDriftBoat.com
Just a few more details...
The Euphrates is looking a lot like a dory now. Ash gunwales on, decks framed and covered. We have a fair amount of glass work yet to do as well as the hatch lids, latches, and oarlocks. Trimming the bowpost and transom, rounding and oiling the gunwales... Little details that take up big time. We're starting the next boat in the far side of the shop so we can be working on one while the WEST is kicking on the other.…
Added by Brad Dimock on February 28, 2010 at 9:46pm — 1 Comment
Mass scarfing jig
Added by Brad Dimock on February 27, 2010 at 10:00pm — 5 Comments
A bit about the Euphrates
Added by Brad Dimock on February 25, 2010 at 9:07pm — No Comments
Framing in the deck.
Floor ribs removed in front and rear cross-hatches for ease of packing commercial trips.

Added by Brad Dimock on February 25, 2010 at 8:43pm — No Comments
Bottom on, glassed, and covered with stiff plastic to make her smooth and shiny.

Added by Brad Dimock on February 25, 2010 at 8:34pm — No Comments
Epoxying the foam floor to the sides. Temporary ribs in place.

Added by Brad Dimock on February 25, 2010 at 8:32pm — No Comments
Semi-traditional Briggs boat project.
Added by Brad Dimock on February 25, 2010 at 8:00pm — No Comments
Added by Ukulady on February 18, 2010 at 11:00pm — 4 Comments
Added by Jimmy Emery on February 14, 2010 at 4:59pm — 1 Comment
Added by Ukulady on February 11, 2010 at 10:47pm — No Comments
Added by Rick Newman on February 1, 2010 at 6:31am — No Comments
2013
2012
2011
2010
2009
2008
2007
© 2013 Created by Randy Dersham.